WOODVILLE, WI – The new floor in the Village of Woodville Steven Park shelter is dazzling thanks to a donation to the Village of Woodville, Public Works Department by the Woodville Lions Club that was installed by Blackhawk Garage Door.
The concrete flooring under the picnic tables was starting to deteriorate and needed rehabilitation. Public Works Department director Brent Knegendorf researched what the options for the crumbling, pitted surface would be and ultimately contacted Blackhawk Garage Door of Baldwin, Wisconsin and Bloomington, Minnesota, that offers a swell garage floor resurfacing system. The cost was something that he realized the Woodville Lions Club might consider helping with.
The system that Blackhawk Garage Door offers is Polyurea floor coating. This system allows for extending the concrete surface life to be extended rather than replacing or painting the surface.
To read this and other premium articles in their entirety, pickup the October 26, 2023 issue of the Woodville Leader newspaper. Click to subscribe for convenient delivery by mail, or call (715) 778-4990. Single issues are also available at area newsstands and the Gateway Publishing office in Spring Valley, WI.